House Upstairs Hall Feb. 14, 2003

The railing is in, the walls are painted and the light fixtures are hung. Bathrooms are finished and the marble and some framing is on the fireplace. Heat is on, the gas was turned on and there is hot water. The appliances are in place and the water line run to the refrigerator. The floor has one coat of sealer on it and will be re-sealed on Feb. 15. All the carper is down and the final inspections are being done. If you want to be amazed, go back and look at the first pictures where there is a hole in the ground.


BACK TO MAIN PAGE